Liquifill®
Economical, pumpable and flowable.
Go with the flow with Liquifill®, the labour saving cement based alternative to compacted fill. Liquifill® lets one person do the work of two or three when you need to backfill a trench. Use it for all your backfill needs and tricky infill jobs like filling underground tanks.
8 key advantages
Speeds backfilling
Backfill with Liquifill® and you can knock off earlier. At 180+ slump, Liquifill® is self compacting which reduces your labour costs.No rollers required
Forget hiring loaders, rollers and compactors. Liquifill® is self compacting so use it in areas out of reach of compacting machinery.Superior stability and resists settlement
Liquifill® is ideal for jobs requiring a stable base. It won’t settle or rut under loading. Walk on it within 10 hours. Drive heavy machinery over it within 24 hours.Resists erorsion
Liquifill® is far less water permeable than standard fill so it offers superior resistance to erosion.Reduced voids
Use Liquifill® to ensure that buried services are completely and uniformly supported.Increased safety
No need to have your workers in the trench during compaction.Cuts excavation costs
With Liquifill® there’s no need to widen trenches to cater for labour and equipment. In most cases it can be excavated at a later date with hand tools.Customised mixes
Liquifill® mixes can be adjusted at the plant to meet a range of specific site applications.
Applications
- Backfill
- Conduit trenches
- Utility trenches
- Sewer trenches
- Culverts
- Inground tanks
- Retaining walls
- Infill
- Disused water pipes
- Underground tanks
- Abandoned mines
- Disused sewers
- Manholes
For information on the best way to use Liquifill®, contact a Hanson representative.
